According to the Malaysian Institute of Architects schedule of fees, architects are allowed to bill for an amount equal to 70% of their contract fee upon completion of the contract document, that which gets costs put to and which contractors will bid on. It is common practice, however, to have this amount reduced to just over 50% of the contract sum after the rigors of negotiation and payment terms.
There is something absurd about all this.
Logically again now. It means that an architect will be due just over 50% of contract fee for the delivery of a document that in a perfect world should be up to 95% complete in order for tenders to be priced accurately. Seeing that most architects would only have completed what 50% of their fees would have paid for, the simple outcome of all this means that submitted tenders generally reflect lower costs than they should. The vulgar bit comes in because everyone is complicit: the deception simply carries on until the variation orders start pouring in, when the rest of the drawings get done. It is a ludicrous situation, created by a ludicrous belief that risk is minimised in the reduction of fees up front: it legitimises poor design documentation and the end losers are the very projects we had set out to get right.
Let us negotiate fee schedules to correctly reflect the quantity of work performed. When we see how smoothly construction proceeds with a complete document, we might understand why it is that an architect's fee should be near to fully paid before a single brick has even been laid or a single stone turned.
Architects design. Contractors build. Drawings have to be complete. It could not be simpler than that.
context
bedframe
steel entry mat
gardenshell house
system shelves
slat door
monsoon mailbox
louvrebox house
commentary
gardenwall offices
timberblind door
a/c jacket
middleearth door
lightwell house
posttensioned stair
dining table #3
biography
gardenshade shed
onion valet
britishindia offices
archiebunker chair
folding gate
bathshelf #2
bibliography
safari roof house
timber table
brickwall house
dishrack
autopsy table
folded stair
photography
contact
boardformed pool
ventblock house
steeltable
pittsburgh desk
dogconcrete house
kitchenjockey
wallpantry
bricklite house
poolplinths
gardengate
black and white house
cantilevered gate
mule system workstation
bathvalet
sibu pavilion
scrapwood pool
concretecarpet stair
fire stairfence
loftoffice
perforated bench
radiator railing
pivotgate
boardformed house
steel & white bath
brickroom
forestgrove
barnstorm house
dropbench
gnarly house
Kvadrat chaise
stacked club
mountain pool
greensplice house
threshold house
gainer mailbox